First time in a long time we have been some what caught up so wanted to make the best of the time to develop so new fixtures for parts we run often.
On this job its simply profiling some flats on the parts where indicated. I seem to over build everything with more clamps, hold downs or whatever that end up making part changeover too time consuming. Thought about this devise with five 1/2" SHCS to secure the parts while the fixture will be held with 2 double vises with step jaws. 4 Fixtures will be built and two running parts while the other two are changed out.
Any thoughts on improvements for useability?
![Click image for larger version.
Name: Capture FB.JPG
Views: 325
Size: 49.3 KB
ID: 85046]()
On this job its simply profiling some flats on the parts where indicated. I seem to over build everything with more clamps, hold downs or whatever that end up making part changeover too time consuming. Thought about this devise with five 1/2" SHCS to secure the parts while the fixture will be held with 2 double vises with step jaws. 4 Fixtures will be built and two running parts while the other two are changed out.
Any thoughts on improvements for useability?
